Solar & Storage Live Egypt 2026 is over. Some thoughts before we fly home.
Two days at Booth K10, and the quality of conversation was higher than we anticipated. People arrived with site data, not general curiosity. Several distributors already knew exactly which inverter configuration they needed and wanted to talk lead times. That’s not always the case at a first-time market entry.
The recurring theme, unsurprisingly, was grid reliability. Almost everyone we spoke with — whether a factory owner, an EPC, or an installer — framed storage as an operational necessity rather than an efficiency upgrade. It changes how you position a product, and frankly it makes the conversation easier.
Thank you to everyone who visited us. The follow-ups start this week.
One open invitation: several visitors asked about seeing our facility, and we’d genuinely welcome it. Our production base in Wenzhou is 43,000+ m², and we’d rather have you inspect the lines, the testing procedures, and the QC process in person than take our word for it. For anyone evaluating a long-term supply partnership, that visit tends to settle most remaining questions.
If you’d like to arrange one, reach out and we’ll handle the logistics.

